Laserfiche WebLink
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10. 2001 <br /> <br /> c. Catalog numbers and similar data. <br /> <br /> d. Conformance with specifications. <br /> <br /> 3. Where shop drawings vary from requirements of Conwaet Documents as a <br /> result of standard shop practice or other reason, point out variation in letter of <br /> mmsmittal. <br /> <br /> D. Handling: Bind shop drawings in sets and accompany with letter of transmittal listing <br /> numbers and latest dates of drawings submitted. <br /> <br />3.04 SAMPLES <br /> <br /> A. Identification: <br /> <br /> 1. Label samples with name of project, the Architect's project number, supplier's <br /> name, Subcontractor's name, generic name of item, manufacturer's name, <br /> brand name, and model number. <br /> <br /> 2. Accompany sample shipments with transmittal letter referencing name of <br /> Project, the Architect's Project number, drawing sheet and detail, specification <br /> section and paragraph number, and same information with which sample <br /> itself is labeled. <br /> <br /> B. Field Samples and Mock-ups: <br /> 1. Erect at the Project site. <br /> <br /> 2. Size or area: as specified in the respective specifications Section. <br /> <br /> 3. Fabricate each sample and mock-up complete and finished. <br /> <br /> 4. Remove mock-ups at conclusion of work or when approved by Construction <br /> Manager. <br /> <br />3.05 CERTIFICATES OF COMPLIANCE: <br /> <br /> A. Scheduling: Submit concurrently with shop drawings showing work to which <br /> certificates apply unless otherwise noted. <br /> <br /> B. Identification: Mark with name or the Amhitect's project number, specification <br /> section number and paragraph numbers to which compliance is required. <br /> <br /> * * END OF SECTION * * <br /> <br /> Section 01300 <br /> Page 4-4 <br /> <br /> <br />