My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10. 2001 <br /> <br /> c. Catalog numbers and similar data. <br /> <br /> d. Conformance with specifications. <br /> <br /> 3. Where shop drawings vary from requirements of Conwaet Documents as a <br /> result of standard shop practice or other reason, point out variation in letter of <br /> mmsmittal. <br /> <br /> D. Handling: Bind shop drawings in sets and accompany with letter of transmittal listing <br /> numbers and latest dates of drawings submitted. <br /> <br />3.04 SAMPLES <br /> <br /> A. Identification: <br /> <br /> 1. Label samples with name of project, the Architect's project number, supplier's <br /> name, Subcontractor's name, generic name of item, manufacturer's name, <br /> brand name, and model number. <br /> <br /> 2. Accompany sample shipments with transmittal letter referencing name of <br /> Project, the Architect's Project number, drawing sheet and detail, specification <br /> section and paragraph number, and same information with which sample <br /> itself is labeled. <br /> <br /> B. Field Samples and Mock-ups: <br /> 1. Erect at the Project site. <br /> <br /> 2. Size or area: as specified in the respective specifications Section. <br /> <br /> 3. Fabricate each sample and mock-up complete and finished. <br /> <br /> 4. Remove mock-ups at conclusion of work or when approved by Construction <br /> Manager. <br /> <br />3.05 CERTIFICATES OF COMPLIANCE: <br /> <br /> A. Scheduling: Submit concurrently with shop drawings showing work to which <br /> certificates apply unless otherwise noted. <br /> <br /> B. Identification: Mark with name or the Amhitect's project number, specification <br /> section number and paragraph numbers to which compliance is required. <br /> <br /> * * END OF SECTION * * <br /> <br /> Section 01300 <br /> Page 4-4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.