My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 01400 QUALITY CONTROL SERVICES <br /> <br />SECTION 01400: QUALITY CONTROL SERVICES <br />PART ! - GENERAL <br /> <br />1.01 GENERAL CONDITIONS <br /> A. As specified in Divisions 00 and 01 apply to all work in this Section.. <br /> <br />1.02 DESCRIPTION OF WORK <br /> <br /> A. Work Included: Inspections and tests performed by independent agencies, governing <br /> authorities, the Construction Manager and the Contractor(s) as required by the <br /> Owner, Architect, Engineers or as specified in Project Manual. Inspection and <br /> testing services are intended to determine compliance of the work with <br /> requirements specified. Specific quality control requirements are specified in individual <br /> specification Sections. <br /> <br />1.03 RESPONSIBILITIES: <br /> <br /> A. Owner Responsibilities: Except where specifically indicated as being the Contractor's <br /> responsibility, quality control services are the Owner's responsibility, <br /> including those specified to be performed by an independent agency and not <br /> by the Contractor. The Owner shall employ and pay an independent, owner- <br /> approved agency, testing laboratory or other qualified fu'm to perform quality <br /> control services specified. <br /> <br /> 1. The Owner will engage and pay for services of an independent agency <br /> to perform those inspections and tests that are specified as Owner's <br /> responsibilities. <br /> <br /> B. Retest Responsibility: Where results of inspections or tests do not indicate <br /> compliance with Contract requirements, the cost of retesting shall be the <br /> Contractor's responsibility. <br /> <br /> C. Responsibility for Associated Services: The Contractor shall cooperate with <br /> independent agencies performing inspections or tests and provide auxiliary <br /> services as are reasonable to facilitate testing at no additional cost to Owner, including: <br /> <br /> 1. Provide access to the work. <br /> 2. Assist taking samples. <br /> <br />1.04 COORDINATION: <br /> <br /> A. The Owner, Contractor and independent test agencies shall coordinate the sequence <br /> of their activities. Avoid removing and replacing work to accommodate <br /> inspections and tests. The Owner and Contractor shall be responsible for <br /> scheduling times for inspections and tests. <br /> Section 01400 <br /> Page 1-2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.