My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />3.03 BARRIERS <br /> <br /> A. Constxuct barricades, fences, railings, waterproof covered walks, and similar safety <br /> precautions in accordance with industry recognized safety standards. Remove barriers <br /> prior to final acceptance and restore surfaces damaged by erection of ban'icades to <br /> original condition. <br /> <br /> B. Project Barricade: <br /> 1. Provide project fencing for protection of Project site from within and from <br /> without and for protection of the public from construction and its operations. <br /> Provide fencing to provide noise and sight protection. Provide description <br /> of proposed actions to Construction Manager for approval prior to erection. <br /> <br /> C. Covers for Openings: Secure covers for openings into ducts, piping, etc. in <br /> accordance with industry recognized safety standards. <br /> <br /> D. Scaffolding: Provide as required for execution of any part of the Work. <br /> <br /> E. Cranes, Hoists or Chutes: Provide as required for movement of personnel, materials, or <br /> equipment. <br /> <br />3.04 SECURITY <br /> <br /> A. Provide construction period security measures at Project site. <br /> <br /> B. Provide keying different from permanent keying of locks and include organized, <br /> locked, and supervised storage for receiving and dispensing items of Contractors' <br /> hardware, stored historic materials and components, etc., throughout construction <br /> <br /> C. Permanent Keys: Immediately upon r~ipt of permanent keys for whatever purpose, <br /> tag or otherwise clearly identify keys according to one Constraction Manager approved <br /> key control system and deliver keys to Construction Manager prior to the opportunity <br /> of access to keys by parties other than the Owner. <br /> <br />3.05 SPECIAL CONTROLS <br /> <br />A. Rubbish and Debris: <br /> <br /> 1. Dispose of accumulations of rubbish and debris in manner satisfactory to <br /> Construction Manager and in accordance with local ordinances and the State <br /> Health Department. Recycle all recyclable materials in accordance with local <br /> recycling ordinances. <br /> <br /> 2. No burning will be permitted at the Project site. <br /> <br />B. Dust Control: <br /> <br /> Section 01500 <br /> Page 5-6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.