My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> 1. Suppress dust and airborne particulates; confine dirt and dust to consmaction <br /> area and prevent contamination and annoyances to adjacent buildings, <br /> facilities, and general public. <br /> <br />3.06 FIELD OFFICES AND SHEDS <br /> <br /> A. Jobsite Office: <br /> 1. Provide Jobsite Office complete with adequate ventilation, fax machine, <br /> telephones, electric lights, utility services, and janitorial services for use of <br /> Contractor, Construction Manager, Architect, Owner and inspectors throughout <br /> construction period. <br /> <br /> 2. Provide a space for drawing review. <br /> <br /> B. Miscellaneous Construction Sheds: Provide on construction site as required for <br /> protected and secure storage of the Contractors apparatus and materials. Submit <br /> proposed location to Construction Manager for approval. <br /> <br />3.07 SANITARY FACILITIES <br /> <br /> A. Provide for construction personnel, meeting applicable standards of State Department <br /> of Health and the City of Paris: <br /> <br /> B. Toilet Conveniences: <br /> <br /> 1. Provide adequate capacity for use of the Contractor(s), subcontractors, their <br /> representatives and personnel engaged on the work. <br /> <br /> 2. For these conveniences, provide portable shelters and water as required. Sinks <br /> for hand washing must be provided. <br /> <br />3.08 REMOVAL <br /> <br /> A. Upon completion of any portion of the work, promptly remove temporary facilities <br /> generated by that portion of the work, including surplus materials, equipment, and <br /> machinery, and as directed by the ConsWacfion Manager. Upon completion of the <br /> Work, completely remove remaining temporary facilities. <br /> <br /> B. Immediately prior to Final Acceptance inspection, remove all protective tapes, <br /> coatings, paper, etc., thoroughly clean building exterior surfaces and clean and <br /> polish glass, hardware, aluminum, bronze, stainless steel, tile, plumbing fixtures, <br /> partitions, light fixtures, floor coverings, equipment, and similar exposed items to user <br /> ready condition. <br /> <br /> * * END OF SECTION * * <br /> <br /> Section 01500 <br /> Page 6-6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.