Laserfiche WebLink
City Council Meeting <br />August 16, 2000 <br />Page 12 <br />which was 1406 hours of training held in the City of Paris and this also saves <br />money for the City of Paris. Mr. Campbell discussed the monthly reports from <br />1986 through 1996 and compared those, pointing out the difference in the <br />reports. Mr. Campbell asked the City Council to look at report seven, and <br />advised them that this report is ten pages and that starting January of next year <br />it is going to be ten pages every month. Mr. Campbell said the City Council <br />can look at this report and see what information the TNRCC is requiring to be <br />reported on a monthly basis. Mr. Campbell said the new rules and regulations <br />mean that you have to have well trained people to run your water and <br />wastewater systems. Mr. Campbell said the last page of the handout is a <br />budget summary for fiscal year 2000-2001 and the Water Treatment <br />Department shows a 4.40% change in the budget from 1999, the operating <br />budget change is 2.79%, and the capital change is 24.77%. He said the major <br />expenses will be a major postage increase due to the Consumer Confidence <br />Report ($4,000.00); extra chemical costs due to diversion of Pat Mayse water <br />to Lamar Power Partners thus requiring more use of Lake Crook water which <br />requires more treatment ($40,000.00); increased power cost at Pat Mayse Lake <br />because of more pumpage to Lamar Power Partners ($75,000.00); need of <br />fencing the entire sludge disposal field (25,000.00); extend sludge disposal <br />line( $8,000.00); tractor with accessories for use in the sludge field <br />($70,000.00); extend the shop($12,000.00); level sludge disposal field <br />($8,000.00); increased TNRCC fees ($5,000.00); and increased local Health <br />Department fees ($4, 800.00). Mr. Campbell said at the Wastewater Treatment <br />Plant the total budget is up 17%, and part of the reason is the major utilities <br />cost. The operating change has an increase of 12% and the capital change is <br />135% increase. He said the Utilities Department is also in charge of 16 lift <br />stations, and the total change in budget is 40.3%; operating change is 1.3%. <br />Mr. Campbell pointed out that there is a large capital change of 2468.1 % or <br />$112,300.00 which represents two major items. Mr. Campbell said those items <br />are the upgrade of the Sunrise Lift Station and the relocation and rebuilding of <br />the City Lot Lift Station. Mr. Campbell said the first item on this list is <br />chemical cost at the S. E. Lift Station of $15,600.00, and Mr. Campbell said the <br />reason they are having to spend this money is that the sewage in that pipe line <br />