Laserfiche WebLink
Diviaion 2-A Sita Work <br />- TERMITE PROTECTION CONT'D: The Exterminating Contractor <br />shall issue a Pive year Termite Guaranty protecting Owner <br />against infestation of termites in the treated area. On <br />completion a Certification of Compliance shall be delivered <br />to the owner. <br />HACE FILL: Promptly after concrete is cured, remove forms <br />and all rubbish from excavations, backfill, and do such <br />grading as required to avoid standing water in and around <br />building. <br />ROIIGH SITE aRADING: shall comply with the following <br />requirements: Heavy clay shall be used to back fill beams. <br />Make reasonable allowance for cuts and sand-fill under <br />paving and sidewalk and provide a suitable sub-base. <br />Provide drainage in and around building at all timea during <br />the period of construction. Provide temporary ditches if <br />necessary. Avoid damage to existing concrete and <br />plantings. When so directed by the Architect, minor <br />chanqes may be made in the finished contours to make the <br />best use of available dirt. Do all grading as required for <br />paving as called for in Division 2-C. <br />FINE GRADING: Make sure all underground services are in <br />place and the ditches tamped before any attempt is made at <br />finished grading. Back fill and compact at all grade beams <br />etc. Re-distribute stockpiled topsoil to lawn area and <br />fertilize with 1t-5-10 at 20 lbs. per 1000 sq. ft. Harrow <br />or rake to a depth of 2" and finished to a smooth uniform <br />surface. Back dress with topsoil to a smooth slope at <br />sidewalks, curbs, and drives. Grade to drain away from <br />building. Do not destroy lines of drainage. Fine grade <br />areas shall be hand-raked and smooth, free of trash, rocks, <br />etc., suitable for hand lawn mowing with slope to drain the <br />site. <br />12 <br />