My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Diviaion 3-A Concrete Form Work <br />CONCRETE FORM 1PORR <br />GENERAL: Fully cooperate with other trades in the <br />installation of their sleeves, bolts, supports, etc. Comply <br />with all requirements of the "General Requirements". All <br />labor and material under this Division shall be guaranteed <br />in accordance with the General Requirements. See Division <br />2 for Excavation and Dirt Work. <br />3COPE: This section includes all concrete form work. <br />Furnish and erect all forms with required bracing, <br />ties, offsets, chamfei strips, and key joints as <br />specified and required to contain the liquid weight of <br />concrete to a true line. <br />MATERIAL: Forms shall be approved steel forms or 5/8" form <br />ply with 2 X 4 frame. Forms for beams shall be approved <br />steel forms or 5/8" form plywood. Keyed construction <br />joints shall be equal to Heckmann Building Products galv. <br />steel keyed and punched for extending reinforcing steel and <br />of size shown. <br />WORimlAN3HIP: All forms shall be set to a true line, braced <br />and tied to contain liquid concrete. Provide stakes and <br />braces to hold top and bottom of form. Provide jacks, <br />shoring and form ties designed to carry required loads. <br />Oil form treatment shall be applied to forms before steel <br />is in place. Wipe off excess oil. Provide all chamfers, <br />ledges, and strips to pattern concrete panels. Provide a <br />sufficient quantity of forms to not delay construction. <br />Note special forms required for: steps, door sills, and <br />hold downs in floor. Install cartons under all grade <br />beams and wall panels between piers as shown. Lay to tight <br />joint and cut to close void at pier. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.