Laserfiche WebLink
Division 4 <br />Masonry <br />MATERIALS CONT'D: <br />CONTROL JOINTS: Shall be placed where shown and <br />constructed according to plans. Exposed surfaces shall be <br />caulked as called for under Division 7-D, using neopreme <br />rope which shall be 1/8" larger in diameter control joint. <br />CMU BRICK SILLS: Furnish and install CMCT brick size sills <br />Where shown on plans. Brick shall be cut to uniform length <br />and shape and neatly spaced with uniform slope. Provide 10 <br />mil. thick poly flashing under brick window si11 and over <br />door head. Take every precaution to make sills watertight. <br />MASONRY SAW: Shall be provided on the job and availabfe at <br />all times during the installation of masonry. Do not use <br />wet saw on masonry urrits. <br />2 $ <br />