My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 9-B <br />' Drywall <br />GYPSUM BOARD APPLICATION (CONTINUED): All fastening shall <br />~ be dimpled into the surface of the board and fasteners <br />must pull tight. Secure board at top.and bottom edge. <br />No vertical joints shall occur closer than 12" from door <br />- or window jamb. Provide control joints as required, in . <br />no case shall walls exceed 30'-0" without a control joint. <br />Stagger joints each side of studs. <br />INSPECTION: No wall board shall be installed until all <br />studs, hangers, insulation, etc., is in place and approved <br />by the Architect. <br />GYPSUM BOARD CEILINGS: Where finish Schedule calls for <br />gypsum board ceiling, same shall be applied to Chicago <br />Metallic Corp. #630 suspension system with furring 16" <br />O.C. Hanger wires shall be spaced 4'-0" o.c. maximum and <br />shall be 8 gauge. Provide continuous backing for fasteners <br />on the edges of each sheet including wall and ceiling <br />intersections. <br />GYPSUM BOARD JOINT TREATMENT AND TEXTURED FINISH: All . <br />joints in gypsum board shall be bedded and taped and all <br />exposed surfaces finished in a texture. Install Perf-A-Tape <br />in accordance with direction of manufacturer. This portion <br />of the work shall be done by skilled mechanics. <br />- All joints must be brought to a true and uniform surface. ' <br />The amount of joint work required will depend upon the <br />framing and erection of gypboard. Use a steel trowel and <br />extend mud as much as 12" from joint to provide a smooth <br />uniform surface. The joint system shall be inspected under <br />good light and approved before any texture or wall covering <br />is applied. <br />Mask windows, ducts, and surfaces not to receive texture. <br />Surfaces to receive texture shAll have one coat applied <br />to the joints only and brushed out well at the edges. <br />After this coat is dry, apply one heavy coat of texture <br />to entire surface, finishing in a light stipple. Surfaces <br />to receive vinyl wall covering shall have finished joints <br />and a smooth uniform surface without texture. <br />CLEANING: Clean drywall and adjoining surfaces including <br />the edges of casings, doors, windows, floors, etc., and <br />repair any damage from such cause. Wall board shall be <br />approved before application of paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.