My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 9-G <br />Flooring <br />INSTALLATION (CONTINUED): <br />" layment' as manufactured by Kaiser Manufacturing, Inc. <br />or approved equal. Underlayment shall consist of one part <br />Liquid Latex and one part Dry Powder applied according <br />_ to manufacturer's specifications. <br />Clean floors free of dust, dirt, and grease before laying <br />floor. Lay in full bed of adhesive, with all joints straight <br />and tight. Tile to be laid symmetrically about center <br />of rooms with not less than one-half width of tile at walls. <br />Before adhesive is applied, floors shall receive a primer <br />as recommended by the adhesive manufacturer. Where there <br />is no metal threshold and where covering does not extend <br />into adjoining room provide 2" vinyl edging strip under <br />doors and openings. <br />Rubber base shall be neatly installed with mitered inside <br />corners. Rubber base shall be free from buckles and wrinkles <br />and must have 1008 adhesion. <br />MATERIAL FOR REPAIR: Upon completion, the Contractor shall <br />leave for future repair: 10 pieces floor tile and 6 1in. <br />feet of rubber base, <br />CLEANING: Remove surplus adhesive from floors and adjoining <br />surfaces. When building is otherwise complete, clean sur- <br />_ faces of any foreign matter, and buff. Buffing shall be <br />done with a heavy duty buffer. <br />b1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.