Laserfiche WebLink
Division 9-H <br />Painting <br />PAINTING <br />SCOPE OF WORK: The painter shall furnish all labor, <br />materials, scaffolding, tools, etc. required for painting <br />and wall covering as shown on plans and described herein. <br />-He shall visit the premises and acquaint himself with the <br />conditions under which he must work. He shall work in <br />harmony with other trades and protect their work from damage. <br />A minimum temperature of 50 degrees F shall be maintained <br />where painting is being done or is drying. The Painter <br />and General Contractor shall jointly guarantee all painting <br />as called for in General Requirements. <br />WORK NOT INCLUDED: The following surfaces will require <br />no paint except as necessary to repair damage. The following <br />items are specified under other Divisions as listed, but <br />shall be bid by the Painting Contractor: <br />Gypboard joint finishing and Texture are called for under <br />Division 9-B. <br />This Sub-Contractor shall state in his proposal to General <br />Contractor if any of the above are included or excluded. <br />Also, note cabinet work may be factory finished. Painter <br />shall bid cabinet work finish separately. <br />WORKMANSHIP: Work shall be done by skilled mechanics in <br />a workman-like manner. Paint shall be of proper consistency <br />and left free of brush marks, sags, or other defects. <br />The Painter's attention is directed to "General" in Division <br />8-B, regarding the protection of wood doors. Confer with <br />General Contractor. <br />PREPARATION OF SURFACES: Surfaces shall be free from <br />moisture and properly prepared to receive finish. Existing <br />surfaces shall be scraped and sanded to smooth finish and <br />approved by the Architect before applying paint. Sand <br />between coats and remove all dust, dirt, or foreign matter. <br />Woodwork shall be cleaned and dusted before painting. <br />Nails in woodwork shall be set by the Carpenter. Wood <br />surfaces shall be sanded smooth before priming. Woodwork <br />including cracks, joints, and nail holes shall be filled <br />after the first coat with spackling or latex caulking. <br />The Painter shall notify the Architect of any condition <br />which may prevent a satisfactory job. In the absence of <br />such notifications, the Painter will be held responsible <br />for poor work resulting from such conditions. <br />STORAGE OF MATERIALS: A space shall be designated for <br />the storage and mixing of paint, materials and tools. <br />This space shall be adequately protected from damage to <br />floors, walls, etc. Paints shall be kept covered at all <br />times. Take such precautions as needed to prevent fires. <br />52 <br />