Laserfiche WebLink
-z <br />Division 15-A <br />P1Umbing <br />UTILIT7C CONNECTION3: The Plumber shall make arrangements <br />for and pay all costs, except deposits, for utility <br />services shown on plan and required here-in. <br />sEWER: Make proper connection to City sewer line at <br />existing. Make arrangements with the city and pay all <br />cd'sts required for)-sewer tap and service. Verify depth <br />and 3oca"tion of existing sewer before any work is <br />commenced. " <br />WATERT Make connection to existing water line as shown on <br />plans. Tap existing line and provide gate valve with <br />"meter box" cover on new line. Valve and service line <br />shall be of size shown. <br />GA9 SERVICE: Provide gas services as shown on plans and <br />required. Plumber shall make necessary arrangements and <br />pay all cost of extending gas service with pressure <br />Fegulator as required. Provide a loop with union and main <br />c,ut off where required at new tap. The entire <br />3nstallation shall conform to the rules and regulations of <br />the local gas company. Verify the location of existing <br />gas service and install new gas line of size shown with <br />cut'offat enfYance into building. Extend from existing <br />gas line service as indicated. Verify existing meter size <br />with local gas company. <br />EXCAVATION: Provide all,excavation required and carefully <br />grade the bottom of all ditches. Water, gas, and sewer <br />li'nes in yard shall have a minimum coverage of 11-611. <br />Keep•trenches dry and furnish necessary pumps and power. <br />Sewer lines shall be placed in excalation on a smooth, <br />uniformly graded bottom. Sand shall be placed in bottom <br />of excavation where necessary to obtain uniform grade. <br />Gfades Por sewer line shall be set by transit type level <br />'or laser level to grades as required with uniform slope. <br />All underground plumbing'shall be inspected by the <br />Architect prior to covering. I <br />Provide sand bed and sand cover for water lines, sewer <br />lines, and gas lines. Back fill to top of pipe with sand <br />by hand. Avoid large clods that will displace or damage <br />piping. Compact fill to 95% standard proctor as fill is <br />made, using power compactor as required. <br />, <br />: . ! <br />