My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ -6 <br />Division 15-A <br />Plumbing <br />GA3 PIPE AND FITTING3: Exterior underground gas pipe <br />shall be approved type plastic, or as otherwise required <br />by the Local Gas Co., pipe within the building shall be <br />:Schedule 40 Black iron with malleable fittings. Pipe in <br />attic or on exterior walls, as hereinafter described shall <br />be same as above grade. <br />GAS DISTRIBUTION: Gas shall come from existing meter location, underground to new construction, enter the <br />building above the floor line distribute in partitions, <br />overhead above ceilings and suspended as specified for <br />water pipe. All gas connections to equipment other than <br />water heater, will be made by the plumber. The Plumber <br />shall furnish gas valves at each piece of equipment. <br />GAS WATER HEATER; Furnish and install for showers etc., <br />where shown on plans (1 in all) Rheem Model #RFD156-82 <br />commercial or approved equal 82 gallon storage, type, gas <br />fired water heater with temperature and pressure reducing <br />valve pipe to drain. <br />METALBESTpg VENT3: The Plumber will furnish and install <br />Metalbestos or approved equal vents for gas water heater. <br />Vents shall be of size required by appliance and shall, <br />unless otherwise called for, be enclosed in wall. Vents <br />shall be oval or round as conditions require and shall <br />iriclude standard elbows, fittings, rigid type flashing, <br />and Belmont roof vent. <br />TE3T3: Provide water test on all new sewer,•lines. After <br />the drain line roughing-in is completed but before being <br />covered, all openings shall be plugged and filled with <br />water up to the level of the highest outlet. Water test <br />shall remain overnight without loss of water and approved <br />by the architect. Partial tests may be made of individual <br />sections, but the entire system must be given-a final <br />test. <br />Before any water pipe is covered or encased in walls, <br />openings shall be capped and the system made tight under <br />100 psi air pressure for at least four hours. At <br />completion of piping system, with outlets capped, first <br />purge the system of air and then fill with water under <br />full City pressure for a period designated by the <br />Architect, and re-check for any leakage. <br />_ Completed gas system shall be capped off and subjected for <br />8 hours to air pressure of 25 psi without material loss of <br />pressure. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.