My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 15-B <br />, HEATING AND A/C <br />HEATING AND AIR CONDITIONING AND VENTILATING <br />GENERALLY: Bidders shall carefully examine the general <br />plans and.specifications, visit the site, and fully inform <br />themselves as to the condition under which they must work. <br />Should the Bidder find discrepancies or omissions in the <br />plans and specifications, or should he be in doubt as to <br />their intent, he should obtain clarification prior to <br />submitting his bid. <br />GUARANTEE; This Contractor shall guarantee all materials, <br />equipment and labor of this division as called for in <br />General Requirements. This'guarantee shall include the <br />performance of the component parts of the system in strict <br />. accordance with the intent of the specifications. <br />Compressors shall carry a factory 5- year guarantee <br />starting from the date of final acceptance. Such <br />guarantee shall be delivered to the Architect prior to <br />final payment. All forms required by the manufacturer for <br />guarantee shall be filled out and mailed by this <br />Contractor and shall be dated at time of approval and <br />acceptance of the work. <br />TESTING ANp ppJ7gTING: Upon completion, this Sub- <br />Contractor shall set all valves, dampers, motors, <br />thermostats etc., and demonstrate that the system will <br />maintain proper temperature and air circulation. <br />~ sCOPE: This contract includes all equipment, labor, and <br />devices shown and required for a complete working system, <br />including: cooling and heating equipment, ventilation <br />equipment, flashing of required openings, louvers, grilles <br />and registers, duct system, stacks, roof caps, and <br />equipment bases, as shown on plans and required. The <br />following work shall be done by other trades but shall <br />have this Contractor's cooperation, guidance and final <br />connection, cutting and framing for ducts and grilles, <br />concrete slab for compressors,.gas service to heating <br />equipment, drains for condensate, electrical work as shown <br />and explained hereinafter. <br />CODE3, FEE3, PERMIT3 AND IN3PECTION3• Comply with ordinances, codes and regulations having jurisdiction over <br />the work. Give the proper authorities all requisite <br />_ notice relating to the work and be responsible for all <br />violation of law. Obtain any permits required and pay all <br />fees therefor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.