Laserfiche WebLink
LARRY SHAW. CPA <br />Page 3 <br /> <br />· Regionalization of Tampa Bay Water, Tampa Bay, FL; Management Consultant. Participated in o state mandated study to <br /> develop a regional water supply utility for three counties and three city utilities in the Tampa Bay, Florida area. Work <br /> involved condition assessment of facilities with an engineering firm, the development of the initial cost based pricing <br /> structure, the assignment of value to facilities donated by each member government and the deveJopmenl of member <br /> contrads with the regional utility. <br /> <br />· Privatization Evaluations; Senior Management Consultant. Evaluated the appropriateness of privatizing all or a portion of <br /> utility operations for utilities in Texas, Louisiana, District of Columbia, Florida and Ohio. <br /> <br />· Utilily System Evaluation, San Antonio, TX; Proied Manager. Managed a project, with the assistance of two engineering <br /> firms, to assess the condition of a water and wastewater system owned and operated by a developer for potential purchase <br /> by the Ci~/of San Antonio. <br /> <br />Information Technology Project Experience <br /> <br />· San Antonio Water System (SAWS) IT Master Plan, San Antonio, Texas; Project Diredor. Carter & Burgess projed team <br /> members managed the development of a strategic IT plan identifying the vision and recommendations for technology for <br /> the future. Entails evaluation of the current systems in information management, technology and automation. A specific <br /> outsourcing study is also being performed. <br /> <br />· DWU Information Technology System Development & Implementation, Dallas, TX; Projed Manager. Managed the design, <br /> package seledion and implementation of a customer accounting and billing system for the Dallas Water Utilities <br /> incorporating water, wastewater, solid waste and storm water services. Performed an organizational assessment to reflect <br /> the changes needed to accommodate and obtain maximum benefit from the designed billing system to be implemented <br /> within twelve months. <br /> <br />· Information Technology System Development & Implementation, Various Locations, TX; Management Consultant. Provided <br /> technical assistance and quality assurance reviews for similar customer system projects in Tucson, Honolulu, Cincinnati, <br /> Columbus, Trenton, Miami, Winnipeg, San Antonio and the Sam Houston Electric Cooperative. <br /> <br />· Information Technology System Development, San Antonio, TX; Project Manager. Managed the design, development and <br /> implementation of financial planning, fixed assets, project tracking and inventory systems at a metropolitan wastewater <br /> utility in Texas. <br /> <br />· Evaluation of Billing System's Development, Son Antonio, TX; Projed Manager. Managed the evaluation of a custom <br /> designed and developed utility billing system for a water, wastewater and storm water utiJjly in process of development by <br /> another firm. Recommended abandonmenl of the project and restarting the project using standard and proven system <br /> development methodologies. Performed similar engagements at another water utility and at a gas utility. <br /> <br /> <br />