My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br />-- requirements for training of Local Education Agency maintenance and <br /> <br /> custodial staff as set forth at EPA [40 CFR 763.92 (a) (2)]. <br />-- 1.1.43 Containment - A portion of the regulated area that has been sealed <br /> and placed under negative air pressure with high efficiency <br /> particulate air-filter (HEPA) filtered negative air machines. <br /> <br /> 1.1.44 Contractor - The individual and/or business with which the Building <br /> Owner arranges to perform the asbestos abatement. It is recommended <br /> <br />-- that wherever asbestos abatement is part of a larger project, the <br /> asbestos work be contracted separately and distinctly from other <br />-- contract work. When this is not possible, the Contractor is <br /> <br /> responsible for the proper completion of project activities in <br /> <br /> accordance with this contract specifications even where a <br /> subcontractor has been retained to perform the actual abatement. <br /> <br /> 1.1.45 Critical barrier - One or more layers of plastic sealed over all <br /> openings into a work area or any other similarly placed physical <br /> barrier sufficient to prevent airborne asbestos in a work area from <br /> <br />-- migrating to an adjacent area. <br /> 1.1.46 Curtained doorway - a device to allow ingress or egress from one room <br />-- to another while permitting minimal air movement between the rooms, <br /> <br /> typically constructed by placing two overlapping sheets of plastic <br /> over an existing or temporarily framed doorway, securing each along <br /> the top of the doorway and securing the vertical edge of the other <br /> sheet along the opposite vertical side of the doorway. Other <br /> effective designs are permissible. <br /> <br /> 1.1.47 Decontamination area - An enclosed area adjacent and connected to the <br /> regulated area and consisting of an equipment room, shower area, and <br /> clean room, which is used for the decontamination of workers, <br />_ materials, and equipment that are contaminated with asbestos. <br /> <br /> 1.1.48 Decontamination enclosure system A series of connected rooms, <br /> separated from the work area and from each other by air locks, for <br /> the decontamination of workers and equipment. <br /> <br />1.1.49 Demolition The wrecking or taking out of any load-supporting <br /> -- structural member of a facility together with any related handling <br /> <br /> operations. <br /> <br />-- 1.1.50 Department - The Texas Department of Health. <br /> <br />-- 4/1~/03 28 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.