Laserfiche WebLink
PROJECTED COST ESTIHATES <br />COX FIELD <br />CITY OF PARIS <br />JCTNE 26, 1979 <br />Minimal Phase II Items: <br />I tem <br />Cost <br />Taxiway <br />$147,058 <br />Auto Access <br />8,494 <br />Gravel Road Pavement <br />8,475 <br />Taxiway Widening <br />1.8,848 <br />TOTAL <br />$182,875 <br />Additional Phase TI items that <br />need to be considered: <br />Overlay Taxiway A <br />$1.20,138 <br />Main Apron Crack Repair <br />44,525 <br />Gasoline Apron, Asphalt <br />W /Concrete Pad <br />91,674 <br />Fuel Storage 1- 6,000G; <br />1- 8'000G 20,,,800 (100% City) <br />Taxiway Extension North 444,828 <br />Taxiway Extension South 444,828 <br />Parking Lot N. T- Hangar 19,255 <br />Taxiway Stub NW -SE RW Overlay 6,719 <br />Taxiway B Overlay 79,889 <br />Taxiway C Overlay 16,346 <br />Terminal Entrance Road Parking <br />Lot Seal Coat 5,330 (100% City) <br />