My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987
City-of-Paris
>
City Council
>
Minutes
>
1980-1989
>
1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:04:40 PM
Creation date
2/18/2015 9:41:31 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 87-057 <br />N 756 <br />1 <br />WHEREAS, there exists a vacancy on the membership of <br />the Building Commission of the City of Paris due to the <br />resignation of Jack Denman, and it is necessary to appoint <br />his successor, and the Mayor of the City of Paris, Billy Joe <br />Burnett, having appointed Michael R. Rhodes to serve the <br />unexpired term of Jack Denman, which ends December 31, 1989, <br />and has submitted the name of such person to the City <br />Council of the City of Paris; NOW, THEREFORE, <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />PARIS, That the appointment of Michael R. Rhodes, as a <br />member of the Building Commission of the City of Paris, to <br />serve the unexpired term of Jack Denman,*which ends December <br />31, 1989, is by the City Council of the City of Paris hereby <br />approved and confirmed. <br />Passed and adopted this 11th day of May, 1987. <br />wn;'rr".�r"T. ��� 0 <br />ww • <br />ATTEST: <br />Mattie Cunningham, Ci. C er <br />APPROVED AS TO FORM: <br />r <br />. aynes, ity Attorney <br />Mayor Burnett called for a report from Brandon Chaney, Consultant <br />Engineer, concerning the feasibility and Method of Sewer Service to <br />the Upper Stillhouse Creek Drainage area. <br />Brandon Chaney, Consultant Engineer, appeared before the Council and <br />presented a report on the Feasibility Study on the Upper. Stillhouse <br />Creek Drainage area, and gave an overview of the project with several <br />alternatives plus cost estimates of each alternative. Mr. Chaney <br />recommended alternate No. 3, the reason being it would provide <br />
The URL can be used to link to this page
Your browser does not support the video tag.