Laserfiche WebLink
- r <br />B. WORK PROGRAM (0 -20 Points) <br />In the space below, provide a work program for the proposed project, based <br />on specific questions listed in the scoring criteria. Please present your work <br />program in outline form, placing the requested information under each <br />separate task or step identified. Please attach additional pages if needed. <br />714 <br />7 <br />The City of Paris started the <br />processing of brush by using a <br />chipper machine in 1991. Two <br />(2) sanitation employees go to <br />the curbside of residences :in <br />the City of Paris and process <br />the unprocessed brush by using the chipper machine and <br />blowing the wood chips into a dump truck at the residence. <br />The dump truck carries the wood chips to the city -owned seven <br />(7) acre site in southwest Paris where the wood chips are <br />deposited. None 'of the wood <br />chips go into the landfill and <br />it reduced the waste in 1995, <br />by forty -two percent (42 %) by <br />using the program. We spend <br />an average of three (3) days a <br />week (24 hours) with two (2) <br />employees operating this brush <br />chipper- machine.. „_. �: ... <br />, +,: r �, �:.: +.�- •,;,,� �� „s ” . <br />a 0 <br />, •1 L 1: l IM:111 �iy <br />7 <br />