My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980
City-of-Paris
>
City Council
>
Minutes
>
1980-1989
>
1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 9:01:38 AM
Creation date
9/3/2015 8:52:45 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. B. Wallace cited the need for water and paving improvements on 11th N. E. <br />from Grove Street to Center Street and on E. Hickory Street between 11th N. E. <br />and 14th N. 'E. <br />A. R. Martin requested completion of paving improvement on 11th N. W. between <br />Henderson and Campbell Street. <br />No one else was present to speak and Mayor Malone declared the public hearing <br />closed. He stated that the city staff would prepare a program based on the <br />hearing and submit it to the Council for approval. <br />Mr. McCollum submitted staff's recommended program for the 1981 Community <br />Development Block Grant Pre - application consisting of the following: <br />1. Housing Rehabilitation (approximately 30 units) $175,000.00 <br />2. Park Improvements 40,000.00 <br />3. Drainage Improvements 150,000.00 <br />4. Installation of 6" water main and /or sewer mains and paving for the following <br />streets: <br />a. 12th N. E. - Hickory north to end <br />b. 13th N. E. - Hickory north to end <br />c. 14th N. E. - Hickory north to end <br />d. E. Henderson St. - 3rd N. E. to 5th N. E. <br />e. Sante Fe St. - Main St. to 3rd N. E. <br />f. Center St. - Fitzhugh to 15th N. E. <br />g. Oak Ave. - Main St. to 2nd N. E. <br />h. 2nd N. E. - Oak Ave. to Center St. <br />i. W. Garrett St. - 7th N. W. to 11th N. W. <br />j. 14th N. W. - Shiloh to Franklin <br />k. Franklin St. - 14th N. W. to 15th N. W. <br />1. W. Walker St. - 13th N. W. to 19th N. W. <br />m. 18th N. W. - Shiloh to Campbell <br />n. Long St. - Main to Church <br />o. 3rd S. E. - Washington to Jackson <br />p. Polk St. - 5th S. E. to 10th S. E. <br />q. Cedar St. - 5th S. E. to 8th S. E. <br />r. Oak St. - 8th S. E. west to end <br />* Water Improvements will include upgrading of fire hydrants and new service <br />connections to residences. Proposed paving consists of 8" base material with <br />double penetration surface treatment. No curb and gutter is proposed. <br />Water & Sewer $162,000.00 <br />Paving 238,000.00 <br />Engineering, <br />Contingency & <br />Administration 85,000.00 <br />Total items <br />1, 2, 3, & 4 850,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.